Shanghai, China · Exporting to 40+ countries
HFFS · Doypack Series

BHD-360DS Horizontal Form Fill Seal Machine

Boevan's flagship duplex HFFS machine forms, fills, and seals stand-up, spout, and zipper pouches from roll film at 60–100 pouches per minute — with one-touch changeover between preset bag formats.

Speed 60–100 ppm Filling up to 1,000 ml Bag width 60–250 mm Control PLC + full servo
Full Specifications

Technical Parameters

ModelBHD-360DS (duplex)
Bag typesStandard doypack, spout pouch, zipper pouch, 3-side seal, 4-side seal
Pouch width60–250 mm
Pouch length80–180 mm
Filling capacityUp to 1,000 ml
Packing speed60–100 pouches/min (product-dependent)
Power9 kW
Air consumption300 NL/min
Machine weight2,850 kg
Dimensions7,000 × 1,000 × 1,900 mm
ComplianceISO, GMP, UL, CSA, EAC

Packing Process

1 · Bag forming

Film unwind, zipper feed, bag forming, photocell registration, zipper horizontal and vertical seals, bottom seal, tear notch.

2 · Filling

Servo pulling system, cutting, pouch opening, air flushing, two-stage filling, pouch stretching.

3 · Sealing & outlet

Heat top seal, cooling seal, finished pouches discharged to the outlet conveyor.

Why This Machine

One-touch changeover

Preset bag parameters in the PLC; switching between registered formats takes as little as 30 minutes.

Duplex output

Two pouches per cycle double throughput without doubling floor space.

Material efficiency

Optimized film usage reduces material overhead by up to 15% versus comparable formats.

Applications

Liquid detergents, fabric softeners, ketchup and salad dressings, juices, dairy drinks, condiments — liquid and viscous products from 10 to 1,000 ml in stand-up, spout, or zipper pouches.

Frequently Asked Questions

What information do you need for a quote?
Your product (and viscosity or particle size if relevant), target filling volume, bag format and size, and target speed. Photos or samples of an existing pouch help us respond faster.
What is included with the machine?
Factory acceptance test (FAT) with a 3-hour continuous run, CE-compliant documentation, standard tooling for your agreed bag sizes, and free operator training for your technicians at our Shanghai factory (2 working days).
How are installation and after-sales handled?
On-site installation and commissioning are scheduled with our team at least 4 weeks in advance. Under warranty, we supply replacement parts free of charge (wear parts excluded), plus remote diagnostics support.
What is the typical lead time?
Standard configurations ship in 60–90 days after design confirmation; customized machines depend on scope. We confirm the exact schedule with your quotation.

Get pricing for the BHD-360DS

Tell us your product and target speed — we'll confirm feasibility and quote within 24 hours.